Clark, NJ 07066
ph: 732.340.9145
dsgkdryw
Installation Check List
Before Installation
DSGK Drywall will advise you of the three hour time frame when the installers will arrive. Please insure the job site is accessible during this time period.
During Installation
Unexpected Site Conditions
In most cases, the estimate you receive will accurately reflect the condition of the installation site and it won't be necessary to adjust the cost and/or schedule. However, we occassionaly discover conditions (water damage, plumbing problems, etc.) during the installation that must be addressed before we can complete the project. These conditions may require additional labor and materials. If DSGK Drywall is to complete the necessary work, any additional charges must be approved by the homeowner prior to proceeding with the project, then added to your installation cost and then the schedule will be adjusted accordingly. If this is a multi-faceted project that you are over-seeing and there is an appropriate contractor on the project (plumber, roofer, etc.), you will need to schedule that contractor to perform the necessary work before we can complete your installation.
After drywall installation
When the installation process is complete, our installation team will:
After sanding
Still have questions?
Call or e-mail us at:
(732) 340-9145
or
We accept
all major credit cards.
Copyright 2022 D.S.G.K. Drywall, LLC. All rights reserved.
Clark, NJ 07066
ph: 732.340.9145
dsgkdryw